What does Feasible Engineering Control focus on in lead abatement?

Prepare for the California State Lead Supervisor Exam. Use our comprehensive study tools with flashcards and multiple-choice questions. Ensure success on your exam day!

Feasible Engineering Control emphasizes the modification of design or equipment to minimize lead exposure in environments where lead abatement takes place. The goal is to implement physical changes that reduce the risk of lead exposure. For instance, this could involve redesigning processes, using lead-free materials, or installing ventilation systems that remove lead dust and fumes from the air.

This approach is critical because it targets the source of exposure directly, making it a more effective strategy compared to other options. While worker training, rotation, and regulatory changes can enhance safety protocols and manage exposure risks, they do not directly address the physical environment or processes that lead to those exposures. Feasible Engineering Control is about creating a safer workspace through tangible modifications rather than relying solely on procedural or regulatory measures.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy